The Field Guide

Los Angeles building rules, answered.

Every answer cites the code it comes from and shows the date we last checked it. Written by the Gross Design + Build team, with partners Matt Thompson and Michael Gross.

ADUs and JADUs

ADU rules in Los Angeles: size, height, and setbacks (2026)

The 800 sq ft guarantee, 16 ft height, and 4 ft setbacks. | Reviewed Oct 17, 2026

State ADU vs. LA Ordinance ADU: which route fits your lot

800 sq ft with strong protections, or up to 1,200 sq ft with conditions. | Reviewed Oct 17, 2026

Permits and process

How long do LA ADU permits take? The 60-day rule explained

15 business days for completeness, 60 days to decide. | Reviewed Oct 17, 2026

Do I need an engineer for my LA addition or ADU?

The one-story line, basements, and when plans need a stamp. | Reviewed Oct 17, 2026

More guides

Guide to building an ADU in Los Angeles

ADU types, the design and permit process, and what to know before you start.

How much does an ADU cost in Los Angeles?

What drives the number, and the ranges we see.

Cost to build a custom home in Los Angeles

The cost drivers on a new build.

Design-build vs. architect and contractor

How the two models compare on accountability, budget, and speed.